Internet
How to connect your home without blowing Your budget
With more and more connected devices at home (smartphones, tablets, consoles, TVs, smart objects…), it’s...
Internet
min reading / 2 December 2025
Have you just moved to Luxembourg or are you preparing to? Congratulations! But before enjoying your new home, think about your connection: the time needed to subscribe to an internet plan, install your box, and activate your line may vary depending on your home and its network readiness.
In this article, we explain what to anticipate for an Internet move-in in Luxembourg, how to install your Eltrona box, and what this means in terms of timing.
In Luxembourg, more than 80% of homes are eligible for fiber-to-the-home (FTTH) or quasi-fiber. And around 95% of buildings are covered by a Very High Capacity Network (VHCN) capable of reaching 1 Gb/s or more.
But this alone does not guarantee an immediate activation:
The process heavily depends on the type of home: a pre-connected apartment will be activated much faster than a standalone house requiring street-level work.
For a pre-wired home, the technician’s visit may take only 1 to 3 hours.
However, for a building or house that is not yet connected, the process may take several weeks depending on authorizations, civil engineering work, etc.
To avoid surprises, you need to:
If your new home is already connected:
In this scenario, expect:
This is one of the best-case scenarios—and it’s what Eltrona aims to offer new movers.
If your home is not connected to the fiber network:
For a new build:
Moving to Luxembourg or changing homes can be stressful; internet connection is one of the key things to anticipate. Whether your home is already connected or needs complete fiber installation, timelines vary widely: a few days in the first case, a few weeks (or more) in the second.
As a future Eltrona customer, anticipate early, check eligibility, choose your installation date, and prepare your home for the technician. That way, you’ll enjoy fiber Internet in Luxembourg without unpleasant surprises.
👉 Call Eltrona today to schedule your box installation—we’re here to help ensure a smooth connection.
We recommend contacting Eltrona at least 15 days before your move to arrange the necessary steps, secure a technician appointment, and avoid any prolonged service interruption.
In most cases, no. The technician will install the optical outlet and the box. However, if a wall needs to be drilled, a duct replaced, or a long cable run, additional fees or extra time may apply.
Yes: you can subscribe to another available technology (cable, VDSL) or wait for the fiber connection to be completed. This may take several weeks or months depending on the required work. It is best to check this with Eltrona.
Yes. During the appointment, simply tell the technician where you want it installed (usually the living room near the TV/console). This helps optimize Wi-Fi coverage and ensure the best connection to multimedia devices.